For easy track laying, I print my layout and tape it next to the table. It will guide me to build. For the tracks, I decide to hand laid tracks and I want to test the Fast track system for the turnouts.
I order tools at : http://www.handlaidtrack.com/
All the stuff for hand laying tracks |
I make a template to file inside the rail, because I didn't buy the StockAid tool.
The first turnout took me around 2 hours to build. The next turnout took me around 35 mins.
The first one with all the stuff ready to file, assembly and sold. |
All the turnout are ready for laying |